SUKHOI SERVICE BULLETINS

The reason of issue Bulletin works contents Bulletin No Applied to Delivered
    SUKHOI 26    
1 C42C-18 -4-90 Landing gear struts replacement due to the installation of KT-214 wheels instead of Chekhoslovakian wheels. 26.001-BU (No 116.10. 0001.3) S/N 01-01;from 01-04 to 02-04 Not done
2 Chief designer direction Definition of the text in the Maintenance Scedule and Operation Manual of the Su-26 and Su-26MX regarding air filters 26.002-BE 26MX.002 -BE All planes manufactured earlier Delivered to the dealer on 18.03.93
3 C42C-24 -15-93 The replacement of intake hoses in the smoke system tanks made due to the drawing 09.0089.6.195.000 26.003-BD S/N06-07; 05-07; 06-09;06-10 Delivered
4 Directive SU-29-24 -10-93 dated 14.01.93 Definition of the text in the Maintenance Scedule and Operation Manual of the Su-26 and Su-26MX regarding brake discs 26.004-BE 26MX.004 -BE All planes ,excluding planes from S/N01-01 to 02-04 Delivered
5 Statement dated 22.06.93 Definition of the text in the Maintenance Scedule and Flight Manual of the Su-26 regarding B-92 petrol 26.005-BE All planes manufactured earlier Delivered
6 Statement C42C-24 -8-93 dated 08.04.93 Definition of the text in the Maintenance Scedule and Operation Manual of the Su-26 and Su-26MX regarding the engine frame welding inspection and logbook pages removal 26.006-BE 26MX.005 -BE All planes manufactured earlier Delivered
7 Statement dated 05.02.96 Hand primer pipeline inspection and replacement (if necessary) 26.007-BU All planes manufactured earlier Delivered
    SUKHOI 29    
8 Directive Su-29-64 -014-92 The replacement of the engine mount ring attachment 29.001-BD S/Nfrom 72-01 to 73-03 Delivered in February 1993
9 No24-015 -93 dated 19.03.93 The canopy operational handles replacement 29.002-BU S/Nfrom 72-01 to 73-03 Delivered on 08.04.93
10 Directive Su-24 -7-93 dated 30.03.93 The installation of teflon seal instead of rubber seals on 768600MA electric valves (due to the life time increase up to 1250 h 12 years) 29.004-BD S/N from 72-03 to 74-02 Delivered on 13.01.94
11 Statement 1.1.1.4/979 The replacement of the exhaust system end sections 29.003-BD S/N from 72-03 to 73-03 Delivered on 28.04.93
12 C42C-24 -15-93 The replacement of intake hoses in the smoke system tanks made due to the drawing 09.0089.6.195.000 29.005-BD S/N 74-05 ; 75-01 Delivered on 29.06.93
13 Directive SU-29-24 -10-93 dated 14.01.93 Definition of the text in the Maintenance Scedule and Operation Manual of the Su-29 regarding brake discs 29.006-BE S/N from 72-01 to 75-05 Delivered
14 Directive SU-29-48 -16-93 dated 17.06.93 Reinforcement of the fuselage side panels 29.007.-BD S/N from 72-01 to 74-02 Delivered on 1.10.93
15 Directive SU-29-9 -13-93 The Su-29 fuel breathing system modification 29.008-BD S/N from 72-01 to 74-01 Delivered
16 Directive dated 22.04.94 The installation of loops along the rudder cable linkage in order to limit cables play 29.010-BD S/N from 72-01 to 77-01 Delivered 18.06.94
17 Directive dated 21.01.94 The installation of the spring on the croach seat belt attachment 29.009-BU S/N from 72-01 to 75-04 Delivered on 01.04.94
18 Directive dated 19.06.94 Reinforcement of the front spar and attachment points of the stabilizer 29.011-BD S/N from 72-01 to 77-01 Delivered on 20.06.94
19 Directive Su-29-64 -14-94 Definition of the text in the Maintenance Scedule and Operation Manual of the Su-29 regarding the replacement of the engine mount ring studs every 300 hours. 29.012-BE S/N from 72-01 to 77-04 Delivered on 14.05.96
20 Chief designer directive 29-46-94 , strenght dept.directive 29-43-94 Definition of the text in the Maintenance Scedule and Operation Manual of the Su-29 regarding the inspection of the stabilizer attachment points for the lack of cracks and plays 29.013-BE S/N from 72-01 to 78-05 Delivered on 01.06.95
21 Chief designer directive Wing replacement GK-285/29 -020BA 80-05 Done on 05.09.96
    SUKHOI 31    
22 Directive 31-18-9/94 dated 23.06.94 Main fuel tank replacement after 100 hours 31.001-BD All Russia based Su-31s  
23 Directive Su-31-303 -514-96KB Fuselage frame reinforcement at the wing attachment points and at the elevator bellcrank attachment point. 31.002-BD S/N 01-01 ; 01-02 Done
24 Directive dated 18.04.96 The installation of loops along the rudder cable linkage in order to limit cables play 31.003-BD S/N from 01-01 to 03-05 Done
25 Directive SU-31 -01-96 dated 23.05.96 Wing replacement 31.004-BA   Done
26 Directive SU-31 -03-96 dated 21.06.96 Wing spar visual inspection GK-283/ 31.005BD   Done
27 Directive SU-31 -03-96 dated 21.06.96 Wing spar ultrasonic inspection GK-283/ 31.006BD   Done
28 Statement SKO dated 01.09.97 Fuel breathing pipe modification 31.007-BD All Su-26, Su-29, Su-31 planes Done
29 Chief designer directive Installation of bolts instead of studs at the upper landing gear attachment point 31.008-BU To be issued soon To be issued soon