Yak-55 airplane Service Bulletins

 

 

Bulletin No

Contents

Applies to a/c s/n

 

55-14-BD

Reinforcement of the wing rib No 4 within the aileron attachment area

 

860103-880701

 

55-15-BD

Replacement of tail wheel fork.  Elimination of the contact between the rudder and tail wheel spring

 

860103-890810

 

55-17-BE

Replacement of the bracket No.55.5100-70 with the reinforced bracket No.55.5100-180

 

860106-890801

55-18-BE

Manuals text clarification

 

 

55-19-BD

Reinforcement of the area where tube spar attaches to the elevator structure  (until 250 flight hours)

 

860103-900906

55-20-BE

Elimination of main landing gear play.  Text clarification

 

 

55-21-BD

Adding plates No.55.4100.103 and bolts No.55.0100.07 into each spares kit supplied with previously manufactured airplanes. (Bolts to be replaced after 250 flight hours)

 

860103-901010

 

55-22-BD

Replacement of engine frame upper brackets with reinforced ones.

 

860103-901110

 

55-24-BD

Replacement wheel axles No.55-4100-110 with axles No.55-4100-35 after 350 landings

 

860103-901005

 

55-25-BE

Extending life time upt to 500 flight hours and 2000 landings

 

 

55-27-BD

Reiforcement of engine cowling by the installation of additional fixation

 

860103-911206

 

55-29-BD

Replacement of elevator and rudder fabric skin after 4+/- 1 years

 

860103-911210

55-30-BD

Changing battery contact plug

860103-901010

 

 

 

55-31-BD

Replacement of axles No.55.4100.501 with reinforced 3 axles No.55.4100.511. Replacement of axle attachment bolts

Relacement of bolts attaching axle No.55.4100.511 to the landing gear spring is to be carried ot after 700 landings

 

 

 

 

901006-911210

 

55-32-BE

Adding text to the paragraph “44.25 landing gear” of the airplane manual

901006-911210

 

2-BU

Replacement of the tail wheel spring No.55.4700.10SB with the reinforced spring No.55.4700-20SB

 

860103-911210

 

Chief of department  VA Kirillov

 

Chief of department  VV Levitsky

 

Project engineer        VB Loiko